Location:
Mangistau region, Tubkaragan district, Dunga deposit
Customer: Maersk Oil Kazakhstan GmbH
Start of construction: April 2014
Completion of construction: December 2014
Actual duration of construction: 9 months
The following objects are constructed:
1. The main oil pipeline with a length of 9.8 km
2. The main water-injection pipeline with a length of 9.3 km
3. Pipeline of flow lines in an amount of 20 pcs. Total length - 6 km
4. Ferro-concrete inspection pits in quantity of 22 pcs.